5D BIM & Cost Integration Specialist
I turn BIM models, raw BoQs, and project data into structured quantities, cost plans, and decision dashboards — built to the standards your consultants, contractors, and clients require.
Quantities re-measured manually from models that already contain the geometry. Cost plans disconnected from live design. Dashboards rebuilt from scratch each cycle. This practice closes that gap.
Cost Manager at AECOM Middle East 2022–2025. BSc Civil Engineering (Hons). Five years across UAE, Malaysia, and Iraq.
Delivered model-to-BoQ workflows, Power BI cost reporting, and post-contract administration on projects from Dubai International Airport Terminal 2 to NEOM Sindalah Island.
Each service is scoped around a specific deliverable — not an open-ended day rate.
Revit / IFC model → structured Bills of Quantities, coded and ready for tender or post-contract use.
Assessment of contractor or design-team model submissions for commercial accuracy — before quantities are accepted.
Model configured for reliable quantity extraction — shared parameters, NRM / WBS coding, ISO 19650-aligned naming.
Live cost reporting dashboard connecting BoQ data, design changes, and model revisions — built and handed over to your team.
Ongoing specialist support across pre- and post-contract stages — scoped per deliverable, not by the hour.
Delivered in cost management and BIM specialist roles at AECOM Middle East.
Specialist capacity for BoQ production, 5D quantification, and Power BI reporting — structured to integrate with your delivery process and client reporting cycle.
Model-based quantity take-offs, BIM commercial audit, and variation documentation — giving your commercial team structured data for pricing and post-contract claim support.
Pre-contract cost intelligence, feasibility estimates, and live dashboards — keeping your cost position current through every stage of design evolution.
Cost reporting infrastructure, design change tracking, and model-linked quantity validation — the commercial data structure required for informed programme decisions.
Model files, BoQ, drawings, or brief — share what you have. Scope is reviewed and confirmed before any work begins.
Data structured to NRM, POMI, WBS, or project-specific coding. Deliverables agreed and timeline confirmed.
Quantities extracted from model, cross-checked against documentation, reconciled. Anomalies flagged before delivery.
Final output issued in agreed format — BoQ, dashboard, or audit report — fully documented for immediate commercial use.
All outputs compatible with major GCC project CDE environments and standard consultant toolsets.
Send a project brief, model file, or BoQ — scope is reviewed and deliverables confirmed with no commitment required for an initial review.